Industry Project Profiles

 

 

LNG Six Project, Nigeria

  • Project Owner: NLNG, Nigeria
  • Project Duration: 12 Months

LNG Six ProjectScope of Work: Installation Management, Testing, Inspection, Pre-commissioning, Punch fixing, System Turnover and Documentation of Electrical, Control and Instrumentation: Cable Ways, Cables, JB’s, Panels, and Control Room & Field Equipments. Our Scope also included Startup and Commissioning Assistance. Control Systems utilized on Project – Honeywell TDC 3000, Triconex 1121, Yokogawa and Foxboro PLC’s.

 

TCO SGI / SGP Project, Kazakhstan

  • Project Owner: TCO
  • Project Duration: 29 Months

TCO SGI/SGP ProjectScope of Work: Field Engineering (Electrical / Instrumentation and Control), Pre-installation Calibration, Installation Management, Inspection, Loop Check, Testing, Pre-commissioning, Punch fixing, System Turnover and Documentation of Electrical, Control and Instrumentation: “Cable Ways ,Cables, JB’s, Panels ,Control Room and Field Equipment”, Subsystems – VMS,ESD, Compressor Control, IT and Communications. Control Systems utilized on Project - Honeywell TDC 3000, Compressor Control, Bentley Nevada Vibration Monitoring System and Temperature Monitoring System.

 

Olefins Plant, Petro Rabigh, Saudi Arabia

  • Project Owner: Petro Rabigh
  • Project Duration: 18 Months

Scope of Work: Installation Management and Installation of Vendor Skid Electrical and Instrument Equipments. Inspection, Loop Check, Testing, Pre-commissioning, Punch fixing, System Turnover and Documentation. Our Scope also included Startup and Commissioning Assistance. Control Systems utilized on Project – Yokogawa CS3000 DCS and PLC’s, Bentley Nevada Vibration Monitoring System and Compressor Control.

 

Terminal 5, Heathrow Airport, United Kingdom

  • Project Owner: BAA/Honeywell
  • Project Duration: 24 Months

Terminal 5Scope of Work: Installation Management, Procurement of bulk materials, Installation, Testing and Commissioning of Building Management System, Fire Detection, Voice Alarm, and Public Address System in both Terminal 5 A and B Our Scope also included Startup and Commissioning Assistance. Control System utilized – Honeywell.

 

Bayer MDI Project, Shanghai, China

  • Project Owner: Bayer Material Science
  • Project Duration: 24 Months

Scope of Work: Electrical & Instrumentation Engineering, Construction Installation Management and System Integration. Scope included three Delta V Systems, Transformers, MCC’s and VSD Panels. Our Scope also included Startup and Commissioning Assistance. Control System utilized on Project – Emerson Delta V.

 

SWCC Wetwells Project, Saudi

  • Project Owner: SWCC
  • Project Duration: 18 Months

Scope of Work: Design, Detailed Engineering, Selection of Control System, Procurement and Installation Management and Installation of the ABB Advant System, MCC’s, Switchgear and Control Panels. Our Scope also included Startup and Commissioning of the Process Plant. Control System utilized on Project – ABB Advant.